Skip to main content

GoodWe vs SigEnergy: Which Battery Should You Fit in 2026?

Short answer: GoodWe is the value pick — a wall-hung hybrid inverter plus a Lynx Home F battery tower, indicatively £4,000–£8,500 fitted at 0% VAT, with a free extension to a 10-year inverter warranty if it's registered properly. SigEnergy's SigenStor is the more capable system: one IP66 stack combining inverter, battery, energy management and — uniquely among the brands we fit — an optional 12 kW DC EV charger, indicatively £4,500–£9,500 fitted. We fit both across the Solent from our Whiteley base, so this isn't a datasheet rewrite. Choose GoodWe for straightforward storage at the lowest cost per usable kWh. Choose SigenStor if you drive an EV, want whole-home backup, or expect the system to grow.

Below: the full spec table, indicative 2026 price bands, the three scenarios where we'd pick one over the other, and the practical differences that only show up on commissioning day. Prices are guide bands for a typical Hampshire retrofit and are confirmed at survey.

Get a free survey from Tom

GoodWe vs SigEnergy: 2026 spec comparison

Both systems use lithium iron phosphate (LFP) cells — the safer, longer-cycle chemistry for home storage — and both are hybrid, DC-coupled systems that run your panels and your battery through one piece of electronics. The real difference is architectural. GoodWe splits the job across a wall-mounted hybrid inverter and a separate battery tower. SigEnergy's SigenStor puts the inverter, battery management, storage modules, energy management and (optionally) an EV charger into a single stack. Here is how they line up in 2026.

SpecificationGoodWe (Lynx Home F + EH PLUS+ / ET PLUS+ hybrid)SigEnergy SigenStor
Battery modulesLynx Home F: 3.27 kWh per module, 2–5 modules per tower (6.6–16.4 kWh). Newer Lynx F G2: 3.2 kWh modules, 2–9 per tower (6.4–28.8 kWh)BAT 6.0 (6.02 kWh nominal / 5.84 kWh usable) and BAT 10.0 (9.04 kWh nominal / 8.76 kWh usable) stacking modules, mixable in one stack
Usable capacity, popular UK sizes6.55 kWh (2 modules) · 9.8 kWh (3) · 16.38 kWh (5) — GoodWe quotes usable energy at essentially the full nominal figure5.84 kWh (1 × BAT 6.0) · 8.76 kWh (1 × BAT 10.0) · 17.52 kWh (2 × BAT 10.0)
Maximum system sizeUp to 28.8 kWh per Lynx F G2 tower; up to 8 towers in parallel (~230 kWh) for commercial workUp to 6 modules per Energy Controller — roughly 35–53 kWh usable (about 54 kWh nominal) depending on module mix
Inverter / controller powerEH PLUS+ single-phase 3.6 / 5.0 / 6.0 kW; ES G2 3–6 kW; ET PLUS+ three-phase 5–10 kWSigen Energy Controller single-phase in nine sizes from 3.0 to 12 kW (3, 3.6, 4, 4.6, 5, 6, 8, 10, 12 kW); three-phase versions from roughly 5 kW to 25 kW
Battery charge / discharge power25 A continuous each direction. Up to 6 kW charging; discharge is model-dependent — 5 kW on the GW5000N-EH, 6 kW on the GW6000N-EHSet by the Energy Controller — up to 12 kW on the largest single-phase unit
Backup / EPSUPS-level backup, <10 ms switchover, backup output 3,600 / 5,000 / 6,000 VA by model, on selected backed-up circuitsSigen Gateway: backup port for critical loads, Smart Port (up to 55 A / 12 kW) for non-critical loads and generator input; the 100 A / 22 kW HomePro variant backs the whole property without segregating circuits. Sigenergy claims 0 ms load-side disruption, though the Gateway is not formally classed as a UPS
Integrated EV chargingNone — you add a separate AC chargepoint (Zappi, Ohme or similar)Optional 12 kW DC charging module built into the stack (25 kW for commercial; some UK listings rate the domestic unit at 12.5 kW), CCS2, 5 m / 7.5 m / 10 m cable, bidirectional V2X-ready hardware
App & monitoringSEMS Portal / SEMS+ app. Mature, stable, less granularmySigen app, roughly 10-second data refresh, tariff and scheduling features
WeatherproofingInverter IP65; Lynx F G2 battery IP55, rated for indoor or sheltered external installation — we prefer indoors, garage or utilityIP66 across the stack — genuinely happy outdoors, including exposed coastal walls
WarrantyBattery 10 years. Inverter 5 years standard, free extension to 10 years via the GoodWe PLUS+ programme (qualified PLUS+ installer, serial numbers registered, SEMS+ data uploading, first operation by 31 Dec 2026)10 years on modules and main components, guaranteeing 70% cell capacity at 10 years, with an optional paid extension to 15 years. The Gateway carries 5 years, extendable to 10
Indicative installed price (0% VAT)£4,000–£8,500 depending on size£4,500–£9,500 depending on size; DC EV module extra

One naming trap worth knowing: SigEnergy's module names round up. A "BAT 10.0" is 9.04 kWh nominal and 8.76 kWh usable, not 10 kWh. GoodWe's Lynx Home F is the opposite — the datasheet's usable energy figure sits at essentially the full nominal capacity, so a five-module tower really does give you 16.38 kWh to play with.

On paper they are closer than the marketing suggests. Both will store a day's south-coast generation, both do sub-second changeover to backup, both are covered for a decade. Where they diverge is cost per usable kWh, what you can bolt onto them later, and how much wall you have to give up — which is what the rest of this page is about. If you want the wider field including Fox ESS and Tesla, start with our best solar battery 2026 comparison.

Cost and payback at 0% VAT: what each system really costs fitted

Domestic battery storage — retrofitted or fitted alongside solar — carries 0% VAT until 31 March 2027, after which it is scheduled to revert to 5%. The zero rate applies to installation in residential accommodation by a VAT-registered installer, and has covered standalone retrofit batteries (no solar required) since 1 February 2024. On a £6,000 system that deadline is worth roughly £300, so pricing is as good now as it is going to be. Commercial installations are charged at 20%, recoverable if the business is VAT-registered.

These are indicative installed bands for a typical Hampshire retrofit in 2026 — real fitted prices including labour, isolators, commissioning and the grid application, not trade-counter hardware costs. They are guide figures only; your survey price will differ with cable runs, board condition and siting.

SystemUsable storageIndicative installed (0% VAT)Approx. £/kWh usable
GoodWe EH PLUS+ 3.6–5 kW + Lynx Home F × 26.55 kWh£4,000–£5,000£610–£765
GoodWe EH PLUS+ 5 kW + Lynx Home F × 39.8 kWh£5,000–£6,200£510–£630
GoodWe EH PLUS+ 6 kW + Lynx Home F × 516.38 kWh£7,000–£8,500£425–£520
SigenStor EC 6 kW + BAT 10.08.76 kWh£4,500–£6,000£515–£685
SigenStor EC 6–8 kW + 2 × BAT 10.017.52 kWh£7,500–£9,500£430–£545
Add: Sigen 12 kW DC EV charging module—+£2,000–£3,000—
Add: Sigen Gateway for whole-home backup—+£700–£1,300—

Note the shape of it. At small sizes GoodWe is clearly cheaper per usable kWh, because you are buying modest electronics and a couple of inexpensive modules. As you scale up, SigenStor narrows the gap to roughly level — at the top of each range the two are within about £25/kWh of each other — because you are adding bare battery modules to a controller you have already paid for. What SigenStor does not do, on these bands, is undercut GoodWe outright. If lowest cost per stored kWh is the only metric, GoodWe wins at every size we commonly fit.

On payback, be realistic. Export income alone won't do it: widely available Smart Export Guarantee rates ran roughly 3p to 25p per kWh through 2026, the best of them tied to using the same supplier for your import electricity or to a specific installer, and suppliers can change them with notice — always check the current figure with your own supplier before you model anything. What actually pays for a battery here is tariff arbitrage: charging overnight on a cheap off-peak rate and discharging through the day. On that basis, and assuming a time-of-use import tariff and a battery sized to cycle fully most days, a well-sized retrofit on the Solent is typically modelled at a 6–9 year payback — shorter if you already have solar exporting for pennies, longer on a flat-rate tariff or an oversized bank. It is an estimate, not a promise, and we model it against your own consumption data at survey. Full costings sit on our battery storage service page.

Which one we fit, and when: three honest scenarios

Every job is surveyed and specified before anything is ordered, so the recommendation is the one we have to live with when we come back. Here is how it actually breaks down.

1. Small retrofit on an existing array — GoodWe

A 3–4 bed semi in Locks Heath or Hedge End with a 4 kWp array already on the roof, wanting to stop exporting for pennies. You need 6–10 kWh usable and nothing clever. GoodWe wins on price per kWh at this size, the EH PLUS+ hangs on a garage wall in an afternoon, and the free PLUS+ extension takes the inverter warranty to 10 years at no extra cost. Adding a SigenStor here means paying for an energy controller and an ecosystem you'll never fully use. Details on the range are on our GoodWe brand page.

2. Whole-home backup or a bigger property — SigenStor

Larger detached houses in the Meon Valley, Bishop's Waltham or out toward Hambledon, where the supply is rural, outages are a genuine annoyance and there's a home office to protect. GoodWe's backup covers selected circuits at 3,600–6,000 VA — fine for a fridge, boiler, router and a few sockets. The SigenStor with a Sigen Gateway is designed to carry the whole property: the HomePro variant is rated at 100 A / 22 kW, enough for a full single-phase domestic service without splitting out a backup sub-board, and the Smart Port lets the system shed a high-draw load like an immersion heater rather than dropping the freezer. If backup is the reason you're buying, that difference is the whole decision.

3. EV household, or one that will be — SigenStor

This is the clearest case. The SigenStor's 12 kW DC charging module charges the car directly from DC solar and battery power, skipping the DC→AC→DC double conversion you get with a separate AC chargepoint. One stack, one app, one warranty conversation. The hardware is also bidirectional and V2X-ready, though that is capability in waiting — it depends on your vehicle and on UK standards catching up, so don't buy on it today. If you already have a Zappi or an Ohme you're happy with, the advantage shrinks and GoodWe plus your existing charger is the sensible spend. See the SigEnergy brand page for the full stack options.

Where we'd steer you away from both: if the budget is fixed and tight and you simply want maximum stored kWh for the money, look at our Fox ESS vs GoodWe comparison before you decide — Fox is the volume brand for a reason.

What the datasheets don't tell you: commissioning, firmware and footprint

Four practical differences that never appear in a brochure but shape how the system feels to own.

Commissioning and warranty admin. GoodWe's 10-year inverter warranty is not automatic. It requires a qualified PLUS+ installer, serial numbers registered on the SEMS warranty portal, an inverter manufactured after 1 January 2021, and the system connected and successfully uploading data to the SEMS+ app. That last part matters: if a homeowner changes broadband or moves the router and the inverter drops off the network, the monitoring stops. Worth knowing too: the extension is tied to a named list of compatible GoodWe batteries and to first operation between 15 May 2023 and 31 December 2026, so we check the current eligible-product list at the time of your install rather than assuming. We register every system before we leave and check the upload. The SigenStor commissions through the mySigen app and has connectivity built in, so there's less to go wrong later.

Firmware pace. SigEnergy ships over-the-air updates frequently, adding tariff logic and V2X-related features. That is a genuine advantage if you like the system improving, and a mild irritation if you'd rather it never changed. GoodWe moves slowly and predictably. For a customer who wants set-and-forget, slow is a feature.

Who's still there in year seven. GoodWe has a UK office in Letchworth Garden City with its own UK sales and service contacts; SigEnergy is a much newer arrival to the UK market and support runs through the installer and distributor channel. Neither of those is a service guarantee and we won't pretend to know anyone's turnaround times in advance. But brand continuity is genuinely part of the specification decision right now: GivEnergy Ltd entered administration on 9 April 2026, ceasing to trade, with administrators appointed through the High Court in Leeds. Choosing hardware is partly choosing who will still be answering the phone in year seven.

Footprint, and single unit versus split. The SigenStor is one floor-standing stack, 700 mm wide and 260 mm deep, growing from about 370 mm to just under 2 m tall as you add modules — wall mounting is limited to the smaller configurations, and larger stacks are floor-standing. It needs a clear 700 mm of floor. GoodWe splits into a wall-hung inverter plus a separate battery tower, which is more flexible in awkward spaces but consumes more total wall once you add isolators and the backup switching. In a narrow Southsea utility cupboard that split usually wins. In a Whiteley integral garage, the single stack looks tidier and is faster to fit.

One more: adding capacity later. Both are modular, but on GoodWe extra modules don't buy extra power — you're still capped at the inverter's 25 A, which is up to 6 kW charging and 5–6 kW discharging depending on model. On the SigenStor, spec the Energy Controller for where you're heading, not where you are, or you'll be replacing electronics to unlock the capacity you added.

Grid connection and coastal siting: the Solent specifics

Everything above is national. These are the local realities that change the answer in Fareham, Portsmouth, Southampton and Winchester.

SSEN and the G98/G99 line. Our whole patch sits in SSEN's Southern licence area — Southern Electric Power Distribution covers Hampshire including Southampton, Portsmouth, Winchester and the Isle of Wight — so every grid application goes to them and we handle it. The threshold is simple: G98 covers up to 3.68 kW per phase (11.04 kW across three phases) and is a notification submitted within 28 days of commissioning; G99 is a full application that must be approved before the system goes in. A 5 kW or 6 kW GoodWe EH PLUS+ and any SigenStor Energy Controller above 3.68 kW both fall into G99 territory, so the paperwork and SSEN's response time need to be in the plan from day one — not discovered after you've paid a deposit. Where SSEN restrict export, both systems can be export-limited to an agreed figure without losing the ability to charge the battery.

Single-phase is the norm here. Domestic three-phase supplies are rare across Fareham, Havant and Winchester housing stock, which quietly rules out GoodWe's ET PLUS+ series for most homes — the ET PLUS+ is a three-phase inverter. The realistic domestic GoodWe fit is the single-phase EH PLUS+ or ES G2. ET comes into its own on the light-industrial units around Segensworth and Solent Business Park.

Salt air is a real siting constraint. Around Hamble-le-Rice, Warsash, Lee-on-the-Solent, Gosport seafront and Hayling Island, the SigenStor's IP66 rating means it can genuinely live outside. The Lynx F G2 battery is IP55 — rated for indoor or sheltered external installation — and the GoodWe inverter is IP65. Perfectly good ratings, but on an exposed coastal elevation we'll put GoodWe in a garage or utility every time. That's not a criticism of the kit; it's what the ratings are for.

Housing stock decides the footprint. The 1990s-onward estates at Whiteley, Park Gate and Locks Heath usually have an integral garage and a 100 A single-phase supply — ideal for a floor-standing SigenStor. Victorian terraces in Southsea, Portswood and central Eastleigh often have no garage at all, and a wall-hung GoodWe split is the only thing that physically fits. In the conservation areas around Titchfield, Old Portsmouth and the Winchester City Council area, keeping everything internal also avoids arguments about external equipment.

Sizing to south-coast yield. We see roughly 950–1,050 kWh per kWp per year on Solent roofs, so a typical 4 kWp array generates around 3,800–4,200 kWh annually. That's why 8–10 kWh usable is the sweet spot for most households here — a 20 kWh bank sized for a Scottish winter simply won't cycle enough to earn its keep on a Fareham semi. Treat that as a starting point: on Ofgem’s typical figures a medium-use home needs closer to 5 kWh, which what size solar battery you need works through.

EV grants, briefly. The OZEV chargepoint grant rose from £350 to £500 per socket on 1 April 2026 and covers 75% of the combined chargepoint and installation cost up to that cap — but it is limited to flats, renters and residential landlords, so owner-occupiers with a private driveway are excluded. Landlords can claim up to 200 sockets a year. The separate Workplace Charging Scheme also pays 75% up to £500 per socket, for up to 40 sockets and £20,000 per business. Both schemes are currently funded to 31 March 2027. If you're relying on a grant, confirm the specific unit is on the OZEV-approved list before committing; integrated DC chargers built into a storage stack are not always listed, and we'd rather flag that at survey than after.

The verdict: which battery we'd fit on your house

If you want storage that quietly saves money and nothing else, GoodWe. It's cheaper per usable kWh at every size most Solent homes actually need, the PLUS+ programme gets you a 10-year inverter warranty for free, and there's a UK office behind it. It is the right answer for the majority of straightforward retrofits.

If you drive an EV, need the whole house to stay up during an outage, or you're building toward vehicle-to-home, SigEnergy's SigenStor is worth the premium. The DC EV module and the Sigen Gateway do things GoodWe genuinely cannot, and at 17 kWh and above the cost-per-kWh gap narrows to roughly level — you stop paying a meaningful premium for the extra capability.

What we won't do is sell you the more expensive stack because it's more interesting. Every install here is surveyed and specified by Tom, owner-led from first visit to commissioning, so the system that goes in is the one we'd want to be responsible for in ten years' time. Book a free survey and we'll size both options against your actual consumption data and tell you plainly which one wins on your roof.

Local knowledge that matters here

  • SSEN Southern licence area covers the entire Solent patch — all G98/G99 applications route to SSEN and are handled in-house by Tom
  • G98 = up to 3.68 kW per phase, notification after installation; G99 = full application approved before installation — a 5–6 kW GoodWe EH PLUS+ or any SigenStor EC above 3.6 kW falls into G99
  • South-coast yield of roughly 950–1,050 kWh per kWp per year means a typical 4 kWp Solent array generates ~3,800–4,200 kWh/yr, making 8–10 kWh usable the local sweet spot
  • Coastal salt exposure at Hamble-le-Rice, Warsash, Lee-on-the-Solent, Gosport seafront and Hayling Island — IP66 SigenStor can live outdoors; IP55 Lynx F G2 battery / IP65 GoodWe inverter go in a garage or utility
  • Housing stock split: 1990s-onward estates at Whiteley, Park Gate and Locks Heath typically have integral garages and 100 A single-phase supplies suiting a floor-standing stack, while Victorian terraces in Southsea, Portswood and central Eastleigh have no garage and require a wall-hung split system
  • Domestic three-phase supply is rare across Fareham, Havant and Winchester housing stock, which rules out GoodWe's three-phase ET series for most homes — ET suits the light-industrial units at Segensworth and Solent Business Park
  • Conservation-area constraints around Titchfield, Old Portsmouth and the Winchester City Council area favour internal equipment siting
  • Rural supply quality in the Meon Valley, Bishop's Waltham and toward Hambledon is the main local driver for whole-home backup specification
  • Solent Solar is based in Whiteley, Fareham PO15 and works a 30-mile radius; MCS-certified, HIES and OZEV-approved, owner-led — Tom and his small team survey, design and fit every install
  • GivEnergy Ltd entered administration on 9 April 2026, which is why Solent Solar no longer fits the brand — brand continuity is a live local specification factor

Frequently asked questions

Is SigEnergy better than GoodWe?

Not universally — it's more capable, and more expensive per usable kWh at the sizes most homes buy. SigEnergy's SigenStor does things GoodWe cannot: integrated 12 kW DC EV charging, whole-home backup via the Sigen Gateway, and an IP66 rating that lets it live outdoors. GoodWe is cheaper per usable kWh across the common 6–17 kWh range, has a UK office and support channel behind it, and includes a free extension to a 10-year inverter warranty through the PLUS+ programme. For a straightforward retrofit on an existing array, GoodWe is usually the better buy. For an EV household or one that needs real backup, SigenStor earns the premium — and by about 17 kWh the price-per-kWh gap has narrowed to roughly level.

Can I add a GoodWe or SigEnergy battery to solar panels I already have?

Yes, and it's most of what we do. Both are hybrid (DC-coupled) systems, so a retrofit normally means replacing your existing string inverter with a GoodWe EH PLUS+ or a Sigen Energy Controller and running the panels through the new unit. Your panels, mounting and roof work stay exactly as they are. Retrofit battery storage carries 0% VAT until 31 March 2027 when installed in residential accommodation by a VAT-registered installer — that has covered standalone batteries with no solar since 1 February 2024. We check your array's string configuration at survey: split-orientation roofs, which are common on older Hampshire streets, need the MPPT layout planned properly.

Does the SigenStor's built-in EV charger qualify for the OZEV grant?

Check before you rely on it. The OZEV chargepoint grant rose from £350 to £500 per socket on 1 April 2026 and covers 75% of the combined chargepoint and installation cost up to that cap — but it is limited to flats, renters and residential landlords. Owner-occupiers with a private driveway are excluded entirely, which rules out most of the households asking about SigenStor. Where a household is eligible, the specific unit must appear on the OZEV-approved chargepoint list, and integrated DC chargers built into a storage stack are not always listed. The scheme is funded to 31 March 2027. We confirm current eligibility at survey rather than assuming it.

Do I need SSEN's permission before installing a GoodWe or SigEnergy battery?

Almost certainly, yes. Everything on the Solent sits in SSEN's Southern licence area, covering Hampshire including Southampton, Portsmouth and Winchester. Systems up to 3.68 kW per phase fall under G98, which is a notification submitted to the DNO within 28 days of commissioning. Anything larger — which includes a 5 kW or 6 kW GoodWe EH PLUS+ and any SigenStor Energy Controller above 3.68 kW — needs a full G99 application approved by SSEN before the system is installed. We submit and manage that application as part of the job. If SSEN restrict export in your area, both systems can be export-limited to the agreed figure while still charging the battery normally.

Will battery prices go up when the 0% VAT rate ends?

Effectively, yes. The 0% VAT rate on domestic battery storage runs until 31 March 2027, after which it is scheduled to revert to the reduced 5% rate on 1 April 2027. On a £6,000 installed system that's roughly £300 more for identical work. Commercial installations are charged at 20% throughout, recoverable if the business is VAT-registered. That deadline isn't a reason to rush a badly sized system, but if you were planning to install within the next eighteen months, doing it before the deadline is straightforwardly cheaper.

One small team. Every install.

Tom and his team survey, design and fit every system. Get a free, no-pressure quote.

Contact Tom

Get a free, no-pressure quote

Tom and his small team survey, design and install every system. Tell us where you are and what you are considering — you will get a straight answer, not a sales call.

Call Now Free Quote